Located in the Negev desert

Located in the Negev desert

the plant is located above the Big Crater

Typical local iris

Typical local iris

It is a marvelous endemic specie

Plant Model

Plant Model

as created after the initial design

Starting earthworks

Starting earthworks

included demolition of existing buildings

Construction

Construction

One large crane and several smaller ones to speedup the work

building finished

building finished

Enterance

Enterance

Facade

Facade

Facade detail

Facade detail

Prefab concrete facade

Prefab concrete facade

Lobby

Lobby

Showers and lockers

Showers and lockers

Stair case

Stair case

Tight measurements

Tight measurements

Fast doors

Fast doors

Signs and details

Signs and details

Simple and clear instruction

Floor signs

Floor signs

Each floor has it distinctive color and signs

Aseptic tanks

Aseptic tanks

Storage area

Storage area

Controlled environment and monitors

Controlled environment and monitors

operators can verify that the facility is in spec

Controlled climate warehouse

Controlled climate warehouse

2 narrow aisle tracks. Super-flat floor

Looking into the clean area

Looking into the clean area

Clean corridor

Clean corridor

Clean room systems

View into production room

View into production room

Production room

Production room

Production room

Production room

Floor before room construction

Floor before room construction

Filling room- end packaging

Filling room- end packaging

Packaging corridor

Packaging corridor

Packaging

Packaging

Products

Products

Chilled water system

Chilled water system

800 TR

AHU ducts

AHU ducts

25 AHU's

Chilled water valves

Chilled water valves

Robust and flexible system

Desert view

Desert view

Perrigo Yeruham

Hormone Facility

As part of the expansion plan, Perrigo have built a new 110'000 sq. ft. facility.

 

The facility include production area ISO 8 and OSO 7, Pharmaceutical grade warehouse for raw materials, packaging materials, finished goods and In Process.

Plant utilities include 25 AHU's , 2 new chillers, 2 transformers, generator and waste management.

Production corridor
Facade detail
View from the chopper
Production floor